Reading the result
The list contains Annex 3 pre-work checks. Take necessary measures such as repairs when a defect is found. Annex 2 supervisor duties are separate.
Legal basis
Article 35(2) requires supervisors to conduct the checks in Annex 3. Paragraph 3 requires immediate repair or other necessary measures for defects.
Official Korean legislationExamples
Forklift: four checks covering brakes/steering, load handling/hydraulics, wheels, and lights/warnings.
Air compressor: seven checks from receiver exterior through connections.
Questions
Does an unlisted task need no checks?
No. Other provisions and work procedures may still apply.
Can I mark the printout?
You can record findings against each printed item.
The responsible workplace professional should confirm the final assessment against the original legislation.
Gas concentration conversionChecks and records before work
When preparing pre-work checks, choose the task type and identify the actual equipment and routes workers will use. Different equipment, platforms or material routes can change the check points even when the task name stays the same. Match each item to a physical object with the team. Identify storage and pedestrian areas separately, and consider where people will approach a guard and who else may operate the equipment.
Record the problematic condition and what work should pause under that condition, rather than only marking an item normal. If a platform or railing differs from the plan, or another piece of equipment will pass through the route, recheck the work position and movement boundary. Even if the previous shift marked its checklist, check the changed material layout and worker positions. Do not leave an uncertain item blank; record that it has not been verified. Where additional action is needed, assign who will check which location and hold the affected work until that confirmation is received. Request checks of equipment or changes to site signs outside your authority from the responsible department.
At handover, distinguish changed areas, controls still in force and completed actions. A cleared passage may reopen while a restriction on adjacent equipment remains. Confirm transit and work restart separately. Ask the team to read back the permitted access limit where needed. Review whether a new change overlaps with work by another crew.