Preparation is work at height too: the Shaheen painting-related fall
A worker died after falling while preparing for painting at the Shaheen project on 3 September 2026. Protection needs to cover setup and movement, not only the painting itself.
30-second summary
A fall occurred during preparations for steelwork painting at Shaheen Project Site 1 in Ulsan.
The September 3, 2026 report recorded one death after a fall of approximately 10 m.
Police and the labour ministry were investigating the circumstances and possible legal breaches.
Include access and tool placement before paint application within fall protection planning.

Work background, incident and investigation
A contractor worker was preparing to paint steelwork at Shaheen Project Site 1 in Ulsan. Kyunghyang Shinmun reported the incident in Onsan-eup, Ulju-gun, Ulsan on September 3, 2026.
The reported fall time was approximately 15:50 and the height approximately 10 m. The worker was taken to hospital in cardiac arrest and died at approximately 16:10.
On September 4, Chemlocus reported the company disclosure: the worker reached out from inside a guardrail to pull a spray hose in support of spraying work, lost balance and fell. The report also described police and labour-ministry site checks and a partial suspension covering fireproofing work.
The same-day report gave a height of approximately 10 m; some subsequent reports citing the disclosure gave 13 m. The account of losing balance while pulling a hose came from the next day’s company disclosure, while investigators have not yet issued a final cause finding.
Equipment and work principles — site checks
Preparation positions can differ from the position used for a brush or spray gun. Mark material lifting points, hose deployment positions and movement between steel members separately. Defining the work area only by the surface to be painted can overlook footing during preparation.
HSE guidance considers avoiding work at height, preventing falls and minimising the distance or consequences of remaining falls, with collective protection considered before personal protection. Apply that sequence to identify preparation possible at ground level or from a protected platform.
Plan the hose delivery point together with a protected standing position. The disclosure account describes reaching beyond a guardrail to handle a hose. For comparable work, move the supply point or provide receipt from a protected platform, and check coupling snag points and spare length before starting. If the task requires reaching outside the guardrail, reassess the supply method and working position.
Spray preparation links the supply equipment, hose lifting route and receiving position. Avoid placing the equipment first and then requiring the worker to follow the hose. Plan retrieval as well as reach to the work surface, with a way to stop supply and clear snags from protection instead of pulling harder.
Check the standing surface and continuity of guardrails first. If a hose or tool would require a gate to remain open or a rail to be removed, design a protected passage arrangement. Assess harness travel and connection positions, then check connection continuity while the worker receives equipment.
Published chronology and investigation status
| When | Established account | Source |
|---|---|---|
| 2026-09-03 about 15:50 | Fall of approximately 10 m during painting preparation on steelwork | Kyunghyang Shinmun, 2026-09-03 |
| 2026-09-03 about 16:10 | Death after transfer in cardiac arrest | Same report |
| Report dated 2026-09-03 | Police and labour ministry investigating | Same report |
| Disclosure reported 2026-09-04 | Company account of hose handling beyond a guardrail; partial work suspension | Chemlocus, 2026-09-04 |
Consequences and emergency arrangements
Transfer in cardiac arrest indicates the severity of the outcome. The article does not detail rescue, first aid or obstacles below the fall. A rescue plan for comparable work should cover the responder arrival point and casualty transfer route as well as work height.
Where personal fall protection is used, match available anchors to actual travel. Change the sequence if a connection works at the task but becomes unavailable when receiving materials. Assess anchor suitability against the structure and equipment instructions; do not designate a guardrail as an anchor without that assessment.

Questions for your site
| Question | How to check |
|---|---|
| Can preparation and painting take place within the same protected area? | Mark tool placement and painting positions on the work drawing. |
| Is secure footing available where materials are received? | Set the sender and receiver positions and check them on the platform. |
| Where will the system be stopped and a hose snag resolved? | Set the supply shutoff point and a safe route to the hose. |
| Does movement create a gap in protection? | Walk through the sequence without tools and remove protection gaps. |
| Are anchors and connecting equipment suitable for the method? | Compare equipment instructions, anchor assessment and connection length. |
| Can rescue personnel reach someone after a fall or suspension? | Check rescue equipment access and casualty transfer before work. |
Application at Korean sites
For comparable work in Korea today, the reference is the Rules on Occupational Safety and Health Standards, Ministry of Employment and Labor Ordinance No. 450, effective 2026-03-02. These provisions guide current work; they are not findings of a breach at the time of the incident.
Article 42 establishes working platforms as the primary measure for work with fall risks and distinguishes safety nets and further measures where installation is difficult. Define preparation and movement before selecting protection.
Article 44 requires suitable attachment arrangements and pre-work checks where harnesses are used at heights of 2 m or more with fall risks. Providing a harness and providing a safe attachment arrangement belong together.
References
- Incident and follow-up report · www.khan.co.kr
- HSE — Working at height
- KOSHA · Scaffold work handbook: System scaffolds
- KOSHA GUIDE A-G-12-2026 · Use and maintenance of personal protective equipment
- Incident and follow-up report · www.chemlocus.co.kr
- HSE · Working at height · Step-by-step guide
- Rules on Occupational Safety and Health Standards (Korean)