Field Safety BriefingFIELD SAFETY BRIEFING
Search

English names and summaries of Korean laws are unofficial translations. The Korean text on the Korean Law Information Center (law.go.kr) prevails.

Serious Accident Response in Korea: statutory forms and record templates

Published Updated
Key terms in Korean and English
Safety Kim records times and actions in a response form

1. Statutory forms (annexed to the OSH Act Enforcement Rule)

Available from the Korean Law Information Center (forms are in Korean).

Form When Who
Form No. 28 — Work stoppage order for serious accidents When a stoppage order is issued Issued by the regional office
Form No. 29 — Application to lift a work stoppage order (full or partial) After improvements are complete Submitted by the employer
Form No. 30 — Industrial Accident Investigation Report Within one month of a fatality or an injury/disease needing 3+ days off Submitted by the employer

There is no prescribed form for the immediate report under Article 67; Form B below is an internal memo so the three items are not missed.

2. Site templates (internal records, Korean and English)

Code Template Main fields
A First-response checklist Time of awareness, stoppage time and scope, evacuees, 119 call time, first aid, further-harm measures, checker
B Serious accident report memo Report time, office and officer, method, the three report items, reporter
C Scene preservation and access log Controlled area, start time, people entering, items moved with reason and photo numbers
D Accident timeline sheet Time, fact, source (witness, CCTV, record), verification status
E Work stoppage lifting checklist Improvement items, completion date and evidence, record of hearing affected workers
F Recurrence prevention tracker Direct and management causes; measures by equipment, procedure, people, budget; owner, deadline, completion check; other sites to apply
G Six-monthly SAPA review sheet Results for SAPA Decree Art. 4 sub. 3, 5(b), 7, 8, 9 and Art. 5(2) sub. 1 and 3, and the date reported to the responsible management officer

Korean statutory excerpts

Occupational Safety and Health Act · OSH Act Enforcement Rule · Serious Accidents Punishment Act · SAPA Enforcement Decree

Official government forms

Official Korean government form, downloaded from the Korean Law Information Center (Korean only).

Form 28 — Work stoppage order following a serious accident

Enforcement Rule, Form 28 — HWP via the Korean Law Information Center · Enforcement Rule, Form 28 — PDF via the Korean Law Information Center · Enforcement Rule, Form 28 (Korean Law Information Center)

Form 29 — Application to lift all or part of a work stoppage order

Enforcement Rule, Form 29 — HWP via the Korean Law Information Center · Enforcement Rule, Form 29 — PDF via the Korean Law Information Center · Enforcement Rule, Form 29 (Korean Law Information Center)

Form 30 — Industrial accident investigation form

Enforcement Rule, Form 30 — HWP via the Korean Law Information Center · Enforcement Rule, Form 30 — PDF via the Korean Law Information Center · Enforcement Rule, Form 30 (Korean Law Information Center) · Submit online (Korean)

Excel forms

A4 print-ready Excel with sign-off boxes. Adapt the boxes and wording to your organisation.

A. First response checklist

Download Excel Excel · 9KB · Korean-language file

Preview — A. First response checklist
Serious Accident First-Response ChecklistSign-
off
Prep.Rev.Appr.
Basis: OSH Act Article 54 (employer's actions when a serious accident occurs); Enforcement Rule Article 67 (reporting)
Doc. No.DateDepartment
1. Accident details
Workplace / siteLocation
Occurred atKnown at
How knownFirst aware
Summary
2. Casualties
CategoryDeathsInjuredEmployer / jobNotes
Own workers
Subcontractor workers
Others
3. First-response actions
NoActionDone?TimeBy
Stop the hazardous work and evacuate workers
Call 119 and give first aid
Remove secondary hazards (isolate power, gas, equipment)
Decide the scope of work stoppage (incl. similar work)
Preserve the scene and control access (Form C)
Report to the regional MOEL office (Form B)
Inform the principal contractor and management
Contact the injured worker's family
List witnesses and persons involved
Secure photos, video and CCTV records
4. Remarks and sign-off
Remarks
Prepared by(signature)Checked by(signature)
How to complete
※ Enter times as yyyy-mm-dd hh:mm (e.g. 2026-10-01 09:30). Leave unconfirmed facts blank.
※ When a serious accident occurs, the employer must stop the work immediately, evacuate workers and report to the regional MOEL office without delay (OSH Act Article 54).
※ This sheet is a site record. Use Form B for the report and Form C for scene access.

B. Serious accident report memo

Download Excel Excel · 8KB · Korean-language file

Preview — B. Serious accident report memo
Serious Accident Report RecordSign-
off
Prep.Rev.Appr.
Basis: OSH Act Article 54(2); Enforcement Rule Article 67 (reporting a serious accident)
Doc. No.DateDepartment
1. Report details
Reported atMethod
OfficeReceived by
Reported byContact
2. Report content (Enforcement Rule Article 67)
(1) Outline and damage
(2) Actions and outlook
(3) Other important matters
Office instructions / requests
3. Internal reporting
NoReported toTimeMethodBy
Responsible management officer
Principal contractor
Head-office safety team
4. Follow-up and sign-off
Accident investigation report dueSubmitted on
Prepared by(signature)Checked by(signature)
How to complete
※ Enter times as yyyy-mm-dd hh:mm (e.g. 2026-10-01 09:30). Leave unconfirmed facts blank.
※ On becoming aware of a serious accident, report items (1)–(3) to the regional MOEL office without delay by phone, fax or other suitable means (Enforcement Rule Article 67).
※ Submit the industrial accident investigation report (Enforcement Rule Form 30) within one month of the accident (Enforcement Rule Article 73). Download the official Korean form from the Korean Law Information Center.

C. Scene preservation log

Download Excel Excel · 10KB · Korean-language file

Preview — C. Scene preservation log
Scene Preservation and Access LogSign-
off
Prep.Rev.Appr.
Basis: OSH Act Article 56 (investigation of causes of serious accidents and other covered incidents)
Doc. No.DateDepartment
1. Control outline
Controlled area
Control fromControl lifted
Person in chargeMethod
2. Access record
NoTime inTime outNameOrganisationPurposeCheck
3. Changes to the scene (unavoidable only)
NoTimeItem moved or changedReasonPhoto No.Approved by
How to complete
※ Enter times as yyyy-mm-dd hh:mm (e.g. 2026-10-01 09:30). Leave unconfirmed facts blank.
※ No one may damage the scene of a serious accident or obstruct MOEL's investigation (OSH Act Article 56).
※ If the scene had to be changed for rescue or to prevent further harm, take before-and-after photos and record it in section 3.
※ If you need more rows, insert them inside the table in section 2; the print area extends with them.

D. Accident timeline

Download Excel Excel · 9KB · Korean-language file

Preview — D. Accident timeline
Accident TimelineSign-
off
Prep.Rev.Appr.
Reference: Industrial accident investigation report (Enforcement Rule Form 30), Part III: outline and causes
Doc. No.DateDepartment
1. Accident outline
Occurred atLocation
Type of work involved
Situation at the time
2. Sequence of events
NoTimeConfirmed factSourceStatus
3. Causes (based on confirmed facts)
Direct causes
Management causes
How to complete
※ Enter times as yyyy-mm-dd hh:mm (e.g. 2026-10-01 09:30). Leave unconfirmed facts blank.
※ One fact per row, with its source. Do not use unconfirmed facts as the basis for causes.
※ Sections 1 and 3 can be carried over to Part III of the investigation report (Form 30).

E. Work stoppage lifting checklist

Download Excel Excel · 9KB · Korean-language file

Preview — E. Work stoppage lifting checklist
Work Stoppage Lifting ChecklistSign-
off
Prep.Rev.Appr.
Reference: Application to lift a work stoppage order (Enforcement Rule Form 29); Enforcement Rule Article 69
Doc. No.DateDepartment
1. Stop-work order
Issued byOrder date
ScopeWork / equipment
2. Safety and health improvements
NoHazardImprovement madeCompletedEvidence No.
3. Hearing the workers concerned
NoTimeAttendeesMain viewsReflected
4. Before submitting the application
NoCheck itemDone?Notes
Scope and improvements entered on the application (Form 29)
Evidence of the improvements (photos etc.) attached
Written views of the workers concerned attached
Checkers' unit, title and name entered and signed
5. Progress
Applied onReview meeting
Lifting notifiedWork resumed
How to complete
※ Download and complete the official Korean application (Form 29) from the Korean Law Information Center. This sheet only prepares the submission.
※ The regional MOEL office holds a review meeting within four days of receiving the application (Enforcement Rule Article 69).
※ Enter times as yyyy-mm-dd hh:mm (e.g. 2026-10-01 09:30). Leave unconfirmed facts blank.

F. Recurrence prevention tracker

Download Excel Excel · 9KB · Korean-language file

Preview — F. Recurrence prevention tracker
Recurrence Prevention TrackerSign-
off
Prep.Rev.Appr.
Reference: Industrial accident investigation report (Enforcement Rule Form 30), Part IV: recurrence prevention plan
Doc. No.DateDepartment
1. Accident outline
Occurred atLocationAccident type
2. Action tracking
NoCause typeCauseMeasure typeMeasureOwnerDueVerifiedRoll out toStatus
Prepared by(signature)Reviewed by(signature)
How to complete
※ Give each measure one owner and one due date. If a measure is late, add the reason and the new date to the measure.
※ Under 'Roll out to', list other work, equipment or sites with the same hazard.
※ Section 2 can be carried over to Part IV of the investigation report (Form 30).

G. SAPA six-monthly review

Download Excel Excel · 9KB · Korean-language file

Preview — G. SAPA six-monthly review
SAPA Six-Monthly ReviewSign-
off
Prep.Rev.Appr.
Basis: Serious Accidents Punishment Act (SAPA) Article 4; Enforcement Decree Articles 4 and 5
Doc. No.DateDepartment
1. Review outline
Half-yearReview periodReviewer
2. Results
NoBasisRequirementDateResultDeficienciesAction and due date
Decree
Art. 4(3)
Procedures to identify and improve hazards; review at least every six months and act on findings (deemed met if risk assessment is set up, carried out and reported)
Decree
Art. 4(5)(b)
Give authority and budget to the safety and health managers, supervisors and general safety officers; set criteria and evaluate them at least every six months
Decree
Art. 4(7)
Procedures to hear workers' views; check implementation of improvements at least every six months (deemed met if discussed at the OSH committee or council)
Decree
Art. 4(8)
Serious accident manual (stop work, evacuate, remove hazards, rescue, prevent further harm); review at least every six months
Decree
Art. 4(9)
Criteria and procedures for evaluating contractors, safety cost and (construction, shipbuilding) duration criteria; review at least every six months
Decree
Art. 5(2)(1)
Check compliance with safety and health laws at least every six months; if not met, add staff or budget
Decree
Art. 5(2)(3)
Check that statutory safety training for hazardous work is delivered at least every six months; if not, order it and fund it
3. Report to the responsible management officer
Reported onMethodOfficer's sign-off(signature)
How to complete
※ The reviews under Decree Article 4(3), (5), (7), (8), (9) and Article 5(2)(1) and (3) must be done at least every six months.
※ If the responsible management officer did not carry out the review personally, they must receive the results without delay (Decree Article 5(2)).
※ For deficient items, record the action and due date, and check completion at the next review.

Related official resources

Forms No. 28, 29 and 30 (Korean): open the Enforcement Rule forms tab

Assigning an author and recipient for each form

When selecting a form, identify who prepares it and who receives it. Notes made during rescue, internal reports and statutory submissions have different uses; entering information in a file does not establish that a submission is complete.

When a record is amended, tell recipients what changed. Keep the original record distinct from later additions so a replacement contact can establish which information supported a report.

Check that records match actions rather than focusing only on filled fields. Confirm actual completion with the action owner and pass unfinished items to the follow-up contact.