Safe work

Before connecting lifting accessories: identification, damage, edges and connections
Check sling identification, damage, edge protection and hook connections before lifting, using Korean rules and KOSHA guidance.
Read more →
When floor grating is removed: guarding openings and reopening access
Plan protection before removing floor grating, retain covers, manage temporary openings and check reinstatement before reopening access.
Read more →
Before connecting portable electrical equipment: leads, connectors and location
Check leads, connectors and location before using portable electrical equipment, then distinguish grounding, RCD checks and defect handover.
Read more →
After changing a grinder wheel: guard, mounting and trial operation
Check a portable grinder through wheel replacement: power isolation, guard and wheel selection, trial operation and handover to the next user.
Read more →
After stopping high-pressure water jetting: checks before handling hoses and nozzles
Separate stopping, restart prevention and pressure release before handling jetting hoses or nozzles, with checks on the work boundary and restart handover.
Read more →
After a gas alarm: evacuation, communication and the decision to re-enter
Separate evacuation, communication and access control after a gas alarm, and distinguish a reset alarm from authorization to return to work.
Read more →
Portable ladders and elevating work platforms: check the ground and work position first
Separate the conditions for ladder work, height and standing position from the installation, movement and use of an elevating work platform.
Read more →
Before chemical use: match the container, SDS and work process
Connect the container warning label, accessible SDS and process-specific instructions, including training when materials or hazard information change.
Read more →
Before excavation: connect utility plans to the work boundary
Distinguish work-plan thresholds from utility-damage risks, and connect investigation, protection and machinery stopping conditions to the excavation boundary.
Read more →
Electrical isolation: is the isolated circuit the one you will work on?
Separate the checks for supply identification, locking and tagging, discharge, voltage testing, conditional short-circuit earthing and restoration.
Read more →